AVA ERP › For small manufacturers

For workshops and small industry

The buying, stock and billing side of a small factory

If you run a workshop or a small unit, most of your paperwork happens around the machines: ordering material, checking what arrived, billing what went out and chasing the money. AVA ERP keeps all of that in one place. Here is plainly what it does today, and what it does not.

Buying raw material

  • Purchase orders, with approval above an amount you set, sent to the supplier as a PDF or on WhatsApp.
  • Goods checked at the gate. A goods receipt records the challan number and what was accepted and rejected, and only accepted goods go into stock.
  • Bills matched to what arrived. A supplier’s bill is compared with the order and the receipts, quantities and rates, before it is saved.
  • Freight in the cost. Transport on a bill is carried into what the goods cost you.
  • Advances to suppliers, settled against their bills as they arrive.

Stock in the units you actually use

  • Buy in one unit, count in another. Each item has a base unit, with optional purchase and sales units. Buy sheets by the bundle and count them one by one.
  • Average cost that moves with each receipt, so stock value and the cost of what you sell stay honest.
  • Several locations, with transfers between a store and a shop floor, on Platinum.
  • Low-stock alerts, so a missing material is noticed before the line stops.
  • Damage and internal use recorded with a reason, and shown as a cost in your profit.

Selling and getting paid

  • Quotations with validity and terms that become invoices in one step.
  • GST invoices with HSN codes and the right tax for each state, with printing, packing and courier charges on the bill.
  • Job charges as service items, which hold no stock.
  • Who owes you and whom you owe, with ageing, reminders and statements, plus profit and cash reports.

What it does not do yet

You should know this before you sign up. AVA ERP has no production module today:

  • No bill of materials, and no production entry that uses up material and adds finished goods. Raw material and finished goods are separate items, and you would adjust the stock of each by hand.
  • No job-work tracking of material sent out to others, or the ITC-04 that goes with it.
  • No batch or lot tracking.
  • No e-way bills or e-invoices. You would keep making those on the government portals.

So it suits a unit that mainly needs its buying, stock, billing and dues in order. If your costing depends on a bill of materials, it is not the right choice today. Write to us about what you make and how you make it: what small manufacturers tell us decides what we build next.

Try it with your own purchases and invoices

Free for 14 days. No card, no setup call.

Start your free trial